Condition comes before coating
A lot that needs extensive crack repair, patching, oil treatment, or cleaning will require more preparation than a well-maintained surface.
Sealcoat should be applied only after needed repairs are addressed.
Lot size and layout affect production
Large open parking areas can often be treated more efficiently than small irregular areas with islands, curbs, loading zones, and many obstacles.
The amount of hand work and edging can influence labor.
Phasing can change the project
Occupied Tampa properties may need the lot divided into multiple sections to maintain access.
Additional mobilizations and scheduling constraints can affect the final cost.
Include striping in the budget
Sealcoating covers existing pavement markings, so restriping is usually part of the finished project.
Planning both scopes together provides a more accurate total budget.
Resource Pavement Group provides commercial sealcoating and restriping estimates throughout Tampa Bay.
